The Commission of Competition, with decision no. 515, dated 22.05.2018 “On the authorization of the concentration obtained through the establishment of a joint venture, “Shushica Hydropower” SHPK from “Trema Engineering 2” SHPK, “GR Albania” SHPK and “ALB-STAR” SHPK”, authorized the concentration in the market of production and trade of electricity. This transaction shows no signs of competition restriction in the relevant market or in a particular part of it, as a result of establishing or strengthening a dominant position of parties in the transaction.
For more information, please click on the link below.